Secure I.T. Environments completes Royal Free Hospital data centre upgrade in nine weeks

Secure I.T. Environments completes Royal Free Hospital data centre upgrade in nine weeks

Secure I.T. Environments (SITE), one of the UK’s leading design and build companies for modular, containerised and micro data centres, has completed an air conditioning upgrade project on the main mission-critical data centre at Royal Free Hospital, part of the Royal Free London NHS Foundation Trust. 

The project was commissioned to replace ‘End of Life’ cooling infrastructure and improve the energy efficiency of the data centre.

Originally built in 2010 by Secure I.T. Environments, the data centre serves Royal Free Hospital’s thousands of patients receiving acute and specialist services, including hundreds of transplant patients. It also supports the training of hundreds of medical students every year.

Cutting PUE to 1.15 or less

The existing cooling infrastructure was removed and replaced with four GEA 18D Multi-DENCO down flow close control direct expansion air handling systems and four DENCO ambient air-cooled condensers. 

The new installation now achieves PUE values of 1.15 or less.

This solution achieves a sensible heat ratio (SHR) of 1.0, meaning that air is cooled without dehumidifying it. This combined optimised use of the inverter compressor, electronic expansion valve (EEV) and fans as part of the climate control system reduces energy costs, improves energy efficiency and extends the life of the humidifier cylinder.

A demanding live installation

Any live environment installation needs to be carefully managed, but none more so than a hospital critical data centre. The changing cooling requirements of the data centre meant that the relocation of the external condensing units needed to be housed in a completely different location. This required considerable effort to ensure compliance with building and planning regulations, including acoustic surveys and aesthetic considerations.

Condensers are now located outside on a balcony away from existing services, requiring the installation and weatherproofing of new pipework, and ensuring it would be accessible and safe for on-going maintenance.

“At all times we had to consider that this was a fully operational hospital, with a tight project window to ensure completion before summer temperatures hit,” said Chris Wellfair, Projects Director at Secure I.T. Environments. “We installed temporary cooling to ensure concurrent maintainability of existing services at all times, as well as carefully managing all logistics through multi-departmental planning at the Trust across Properties, Estates and IT.”

As a result of the success of this project – which was completed in just nine weeks – further works have been awarded to Secure I.T. Environments to implement cold aisle containment in the same data centre, and provide UPS and AC upgrades at another.

Secure I.T. Environments provides on-going maintenance support for five rooms at the Royal Free NHS Foundation Trust.

Click below to share this article

Browse our latest issue

Intelligent CIO Europe

View Magazine Archive